Weatherby Lake, MO 64152 WLIC Office Hours: Mon - 1:00pm to 5:00pm, Tue/Wed/Thu - 8:00am to 12:00pm, 1:00pm to 5:00pm, Fri 8:00am to 12:00pm Closed: Mon mornings from 8:00 am to 12:00pm and Fri afternoons from 1:00pm to 5:00pm Office Telephone: 816-741-5556 Office Fax: 816-741-2081 Water Patrol: 816-807-6700 email: office@wlic.org
|
Board of Directors Meeting Monday, September 20, 2010 7:00pm at Town Hall
Committee Meetings are at the Weatherby Lake Town Hall.
Long Range Planning Committee Meeting - Unscheduled Rules & Regulations / By-Laws Committee Meeting - Unscheduled Access Area Committee Meeting - Monday, October 7, 2010 6:30pm Space & Dock Committee Meeting - Unscheduled
|
Click the Logo to go to the City Website!!!
|
COMMUNITY INFORMATON WEBSITE Click the link above to go to the Weatherby Lake Living Website!
|
VOTE FOR DIRECTORS OF WLIC At Membership Meeting Held November 10, 2009 Steve Nelson 135 Don Coleman II 132 Tom Henke 131 Joe Ennett 122 Rick Noble 3 Ron Knop 1 Pat Callagy 1 Glen Vining 1 Devia Surma 1
|
C-POINT RENOVATION TO BEGIN MONDAY, SEPTEMBER 27, 2010
|
In connection with our C-Point renovation project, it is necessary for the lake level to be lowered
approximately four (4) feet below full pool. We will begin draining water from the lake on September 6,
2010 at an anticipated rate of approximately six-ten inches per week. Our first phase of the renovation to
be completed this fall/winter, will include the replacement of the west end aged sea wall, and the
construction of our new gazebo.
If you plan on removing your boat for the winter we are recommending that it be done by September 18th at
which time we expect the lake to be drained to a level between 18 and 24 inches below full pool. This
recommendation is based on our experience last year with the lowering to this level, at which time some
members experienced difficulty with trailers and their boat removal. The last day to utilize C-Point ramps
will be Sunday September 26th, construction and closing of the ramps and gazebo will occur on Monday
September 27th.
The Venita boat ramp will remain open during all C-Point construction. In 2002-3 when the lake was at a
level approximately seven (7) feet below full pool, C-Point and Venita Ramps were extended to
accommodate that level. However, there are drop offs of at least 6 inches between the ramp and the
extensions which make some trailers unusable. The water level at Venita at this time is approximately
eleven (11) feet at the end of the dock or approximately 10 yards from shore.
As to docks, we will be monitoring our improved seawalls for potential anchoring problems during the lake
lowering. Please notify us if you observe a dock situation that needs attention. The WLIC will assist the
approximately 15 members who have docks at the west end of C-Point coordinate with a vendor for the
moving of their docks to M Cove. All members are encouraged to make arrangements with each other to
tie docks together if a problem is anticipated at their location. It is recommended that dock to shore
anchoring cables be loosened appropriately.
Thank you in advance for your cooperation and understanding. The C-Point project will be a great asset for
our community. By lowering the water level we will save over $100,000 rather than attempting to replace
the sea-wall at normal water levels.
IMPORTANT DATES:
September 6th, lake lowering commences
September 18th, recommended boat removal
September 26th last day C-Point ramps are open
Please contact the WLIC website for updates and additional C-Point information: www.wlic.org, or as
always, feel free to call at (816) 741-5556.
Thank you again,
Weatherby Lake Improvement Company
!! URGENT LAKE LOWERING MESSAGE !!
|
ALL AREAS OF WEATHERBY LAKE ARE NOW OPEN FOR SWIMMING.
|